Wednesday, January 22, 2014

Pump Outs Unlimited, the experts in Lift Stations!

 
 
 
 
 
 
Key elements of lift stations include a waste-water receiving well, often equipped with a screen or grinding to remove coarse materials; pumps and piping with associated valves; motors; a power supply system; an equipment control and alarm system; and an odor control system and ventilation system.  Lift station equipment and systems are often installed in an enclosed structure. They can be constructed on-site (custom-designed) or prefabricated.
 
 
 


 
In standard septic systems, gravity is used to flow the sewage from the home to the septic tank, and then to the leach field. When the sewage needs to be pumped because the tank or leach field is at higher ground.septic pumps are also used to pump sewage into the city sewer, when the street sewer line is higher than the home sewage line. Septic Lift Stations fill with sewage to a certain level, then the pump turns on and the sewage is pumped on to the next stage.
Call us now for a proposal!!!



Pump Outs Unlimited
9405 NW 109th Street Suite 5
Miami, Fl 33178
Phone: (305)620-7005/(800)283-1495
Fax: (305)620-7004
Email: info@pumpoutsunlimited.com
www.pumpoutsunlimited.com

No comments:

Post a Comment